Technical Details:
• Roof Style : Gable
• Total Sq. Ft : 480 Sq. Ft
• Building Size : 20' x 24'
• Overall Height : 12'-10"
• Wall Height : 8'
• Roof Pitch : 5/12
• Roof Span : 20'
• Side Door : 30" x 82"
• Overhead Door : 16'W 7'H
• Foundation : Slab
Product Description:
• Complete material list and cutting lists
• Detail drawings and diagrams
• Easy to follow step-by-step Instructions
• Safety and helpful hints
• The materials to build it, are NOT included